The company since its inception, with the power system users have had close co-operation, in addition to providing high-quality power automation products, tailored for power enterprises, and suited to the actual needs of the enterprise applications.
LiCheng City Power Supply Company
The company is a county-level power companies in the implementation of the integrated power management system (substations, large customers, the public changed, Meter Reading) applications in the process, according to the company's actual needs, our company has experience in systems analysis personnel dispatched , optimized design. The system after the implementation of the overall situation can be realized in order to power management as the core, the line loss statistics as a link, while monitoring the power quality of the comprehensive plan, and successfully resolved the overall automation of various types of power reproduced, automatic classification statistics, analysis and forecasting, as well as anti-theft electricity is unusually early warning, alarm, load control and many other management issues, and markedly increase the management efficiency and economic benefits. Achieved a substation, power lines on a large user meter reading, public change monitoring, load control and management, and low-voltage centralized meter reading system, follow-up was also in the gradual implementation of them.
Jinan City Power Supply Bureau
Jinan City Power Supply Bureau 10KV distribution lines in order to improve the automation of management level, since 2002, has done a five-year plan, including the public low-voltage transformer monitoring systems and centralized meter reading system, our company in the fierce market competition and took first place. A project of 500 Yu Gong change monitoring and 30,000 households in the implementation of centralized meter reading system has been completed. The system is running, through the three-phase electrical transformer parameters of real-time monitoring and remote capture, effectively preventing overload and phase imbalance problems from occurring, combined with centralized meter reading system, calculate the assessment of indicators such as low-voltage line loss to truly realize the Taiwan-area management automation. |